Date: 06-25-2017 | |
Number of Hours: 5 | |
Manual Reference: no ref |
After a good hot cure yesterday the pipes were up for another prep session. It took a while to sand away shinny spots between the peel ply but it was done.
I mixed some EZ epoxy and coated the pipes after remounting them on the spindle. While I had some wet EZ I put a ply over the top of the two clickbonds in the sump that I had previously installed. Pic 2. Peel ply over the top and a 10 mt job all done.
Pic three was after 3 hours of coaxing the BID to form around the pipes. Not the easiest layup for sure. Its curing in front of the heater now and will get a couple of checks as it slowly hardens up.
Prepped and sanded
Hydramat clickbonds
Another coat curing