Date: 04-11-2012 | |
Number of Hours: 10 | |
Manual Reference: 5-2 |
Top Longerons
0/4/12 Floxed Sitka Spruce longeron to the RHS. Both sides were trimmed back to the foam edges. Peel ply is then removed and the contact surfaces lightly sanded. The longeron is a datum point so especially needs to be straight. A very light coast of pure epoxy followed by wet flox to both mating sides. Multiple clamps are used and a big cleanup of all excess flox.
11/4/12 Did the LHS top longeron. Same process. The two stiffeners called out for p5-2 are omitted in my build as I will not be cutting out the sides for baggage so these are unnecessary.
Small Longerons 9″ long need to be 2″ high. 1″ pieces are laminated together for this.
RHS Straight Top Longeron
Clamping LHS
Making LWY