Date: 12-01-2014 | |
Number of Hours: 0 | |
Manual Reference: no ref |
Build start DEC 1 2011
Today is DEC 1 2014
Three years building.
This year I completed the CS Spar and in all, 8 spar cap layups were done. Each a huge job. The left and right wings are built although ailerons are yet to be cut out.
I’ve built the canard and have just begun doing the elevators. A few days on the nose light took place as well.
While it doesn’t seem that much I really picked up the pace this year. These planes take a lot of time.
The plan now is to complete the canard, make the winglets then take everything off site and assemble it all at once. That’s going to be a big job. By then I’ll need to have my front window removable so I can get the fuselage with spar attached back in.
I’d like to have the basic airframe completed by the end of year 4. Its going to be an adventure.
CS Spar Done
Wings main section done
Canard glassed