Date: 05-31-2014 | |
Number of Hours: 10 | |
Manual Reference: 19-5 |
This step is adding the shear web to the foam core of the right wing.
I’m using a straight edge built into the jigs to ensure a straight wing.
It was over 10 hours work with 2 of us but finally the six plys of the shear web were done. I’ve peel plied the lot with a view to adding the rest of the wing foam and hard points later.
Nice to get this one completed. It was more work than I thought.
Prep work
Layup done
Peel plied and curing