Date: 08-09-2017 | |
Number of Hours: 5 | |
Manual Reference: no ref |
Here are a few jobs that happen along the way.
As I mucked up the first go at positioning the Andair valve in its correct rotation here’s the second attempt after filling and re-cutting the inlay hole.
Pic 2 is after some fun getting a working cable mounting system for the trap door on/off. You might notice I’ve also done more work on the box getting the edges to seal better. I spent hours fiddling with that thing.
Pic 3 is a shot of my pipe making process. I put plastic pipe on my rotisserie, glass it with prepreg or foil based layups and peel ply the outside which for once is easy.
Re-positioned valve
Cable clamping
Pipe making