Date: 07-19-2017 | |
Number of Hours: 6 | |
Manual Reference: no ref |
Pic 1 and the forward feet duct system is done. That was a biggie. Pic 2 and you can see I have the right duct in place and presenting to it’s little trap door.
Pic 3 and I have glassed the bottom of the heat exchanger so its no encapsulated.
Ducts all secured and hidden away
Right forward duct in place
Heater bottom now glassed