A major step today getting the fuselage to the hangar where I have the wings for a bit longer.
Special thanks to Darren C. who did the car and all the knots. I have no clue how to tie things onto a trailer. We hired the unit which was 6β² wide by 12β² A perfect fit. The canard was tied to the top rail which is not only very secure but mildly terrifying. Darren does the knot thing very well.
Now I have the wings, canard, spar and fuselage at a hangar and about a month to get it sorted. I also have my flying Long-EZ in the same hanger and have to get the annual done and sorted out with the licensed guys there as well. My workroom meanwhile needs a complete reset before the parts return. So I have three projects now and about 4 weeks to run at most.
At the end I should have the wings on the fuselage and the canard fitted. Wish me luck!
Ohβ¦ of course these hours donβt really count in the build, its like time reading plans or sourcing materials, just stuff that needs doing.