Date: 04-13-2013 | |
Number of Hours: 10 | |
Manual Reference: 9-2 |
This shows the UND 18 ply lay up after cure. First pic with the peel ply still attached, second pic removed and the third pic is the start of the BID squares prep.
Note how clean and straight the UND looks. I’m much happier with this method.
First UND with peel ply
Peel ply removed
BID prep