Date: 05-03-2013 | |
Number of Hours: 10 | |
Manual Reference: 9-2 |
Pic 1 shows both UND now complete and the outside BID layup all done.
Pic 2 is again clamping carefully the inside BID layups and
Pic 3 shows the main glass work for the tabs finally done.
This time I’m happy with where things are.
One layup to go
BID inside
Ready for drilling