Date: 04-20-2012 | |
Number of Hours: 10 | |
Manual Reference: 5-2 |
Spent some time setting up the gluing procedure for the lower triangular longeron. As well as a dry clamping session I pre drilled the 2mm holes for nails that assist getting things in place per plans.
After removing the local peel ply and sanding all surfaces I used pure epoxy with a brush and then wet flox to join. The clamps also clamped onto the sides of the workbench. The hardest part was getting all the excess off otherwise a very easy job after all that prep work.
Set up lower longerons
Clamping LHS lower longerons
LHS lower done