Date: 06-25-2018 | |
Number of Hours: 7 | |
Manual Reference: 21-3 |
Today started with cleaning up the strake edges.
Here’s the front section all cleaned up and as you can still see I have way too many cuts in the strake. That said, I have a suspicion it will turn out OK.
You can see the brown tinge now I’ve added micro to the surface. It certainly soaked up a lot.
First ply down and all is good.
Second and third plies down. The last ply is a reinforcement of the strake top just this side for getting into the back seat.
All done and peel plied.
Ok, this is a big deal. Its the last big layup for the major structures of the build.
Yes another 1,000,000 things to do but soak it in. Take a breath, this is the major structural parts all laid up.
This shot is just indulgence. A bit like a BD5 or some delta winged thing.