Date: 01-10-2013 | |
Number of Hours: 10 | |
Manual Reference: 9-1 |
This was over a few days. The actuator pad had been floxed in place, then the area around it sanded and two plies of BID were laid out on foil and then onto the timber. I peel plied the lot as I want smooth transitions in this back seat area.
I then bolted all the hardware together and again tested the brake. Still a bit of work to do.
Actuator pad glassed in
Actuator bolted in
Still with clecos but all good