Date: 02-05-2012 | |
Number of Hours: 10 | |
Manual Reference: 5-2 |
First Micro slurry the entire side. Takes a while as most of the micro is scrapped off. Just enough left to fill the foam and give the glass a bed.
Then very carefully laying out the glass with the bias at 30 degrees and all the fibres very straight. This takes quite a while.
Once straight and everything lined up I begin wetting out.
Ready for micro
Glass layed out, fibers correct
Wetting things out