Date: 07-23-2012 | |
Number of Hours: 10 | |
Manual Reference: 6-5 |
The first pic shows the first lot of inside tapes. All edges are peel plyed. I did this on the 21st. The next pic is the front seat area preped on the 22nd and glassed today (23rd)
These relatively small jobs of 1 ply of BID still take a while and need care and attention to detail.
F22 to IP tapes
Lined up bulkheads
Front seat inside tapes