Date: 12-24-2011 | |
Number of Hours: 5 | |
Manual Reference: 4-2 |
F22 prep then aft face with 2 ply of BID and doubler pressed into place while wet. Then further plys per plans locally over the doubler. Lower edge transitions were peel plied.
I used weights for the cure. Probably not necessary. There is a concern about warping but this is often when external heat is applied and my room was hot enough at 27C.
F22 Prep and IP Prep
F22 with doubler
F22 Doubler