Date: 10-18-2013 | |
Number of Hours: 10 | |
Manual Reference: 13-7 |
This is just a little extra layup NOT in the plans.
Its just two plies of BID 2.2″ X 1″. As you can see in pic 3 its laid up to connect the floor to the bulkhead. Its on the suggestion of another builder who is a Boeing guy.
I can see the floor isn’t really tied into the structure in this area so these tapes just make sense. Especially as there is a big hole in the floor for the front wheel here.
Tape prep
2 ply BID
Tapes in place