Date: 01-18-2019 | |
Number of Hours: 36 | |
Manual Reference: 25-6 |
Its hard to believe how long this takes. I’m just filling the bottoms of the wings. Its been another 10 days.
This was after the first fill and a good sand. The shinny areas are the low points.
You’d think just one more good fill and that would be it. Not so.
Here’s the left wing really coming together. Just about done.
More left wing showing off the winglet intersection curves.
For some reason the right wing needed a few extra days. I’m just adding a little more filler on the top inboard edge. Its nearly done. I’ve also been working a lot on the strakes so that soaked up a few days too. With the wings off access is a lot easier for the area over the spar. Its coming along. A few more days and the wings will go back on.