Date: 01-26-2012 | |
Number of Hours: 10 | |
Manual Reference: 5-1 |
Finally began routing the window and side depression on one of the two fuselage sides. Not happy with using the dremel as a router as depth control is poor. OK to finsh off with sandpaper and more time is required to get the transitions nice. There are a couple of spots that will need a small amount of micro to level out. See how the other side goes!
Route side window edges
Side window cutout
Finishing by hand