Date: 12-31-2011 | |
Number of Hours: 10 | |
Manual Reference: 4-2 |
This took the previous day to prep the glass, cut to size. There are two large plys over the whole bulkhead then 9 additional per side with peel ply at the end. So 20 plies plus peel.
This took around 4 hours and probably the lower plies were starting to cure while I was doing the upper ones. Big job.