Date: 08-08-2015 | |
Number of Hours: 5 | |
Manual Reference: 20-4 |
A little tricky in some respects this still went well. The BID plies took quite a while as I was using gaffer to hold one side up until the other was settled and thats fiddly while keeping the 45 degree bias pretty straight. Its just patience and the experience of working through the positioning carefully. I again cut the cloth to size after it was placed correctly.
With the 2 BID plies done the next 7 UNI followed. The inside layup is slightly more challenging than the outside but still worked out. Using a roller wins over the squeegee or bushes for most of this.
I peel plied in just two large pieces. I’m really over peel ply but it had to be done. In a day or so of curing I will have my right winglet at full strength and then on to the left winglet for the same treatment.
Positioning the dry BID
All plies done
Peel plied