Date: 07-16-2015 | |
Number of Hours: 0 | |
Manual Reference: 20-2 |
While not technically part of the build now the winglets are aligned as well as other things it was time to get the project back to my home workshop. The airfield hangar at YMMB has been great but that window has closed.
I again had absolutely invaluable help from Darren to get things home on a hired trailer. So its goodbye to the other planes where I keep seeing how much work I still have before me.
Pic 2 shows that I can just get the spar mounted fuselage in with the window panels removed. There is 6″ total clearance at the sides.
Pic 3 shows how little space there is. The canard is on the wall and the other wing on a shelf I’ve just built. The whole workshop has been rearranged for this using a scaled plan I made up.
So I allowed no extra build time in this log as ‘arrangements’ don’t really count in the build…but there was a very full week’s work getting this done.
Leaving YMMB
Just fits at home
A tighter working space