Date: 07-07-2015 | |
Number of Hours: 5 | |
Manual Reference: 20-2 |
The right winglet went on today. I had it very close and Michael came in to lend a hand. Under his instruction we rechecked the sweep on the winglet with a far better measurement method than I’d used. The result was about the same but confirmed properly that all was good.
We also added a few rigging blocks to lessen the delicate positioning I’d set up. While both work the later is more reliable. With a set up check good on all four positions, I added 5mt epoxy with a little flox and secured the winglet. We then added the struts you see in pic 3 and I’ll add a few more for security for the eventual drive home and the structural layups.
Next up, the left winglet and set to match the right.
Set up with small blocks
Secured from behind
In place and braced