Date: 03-11-2016 | |
Number of Hours: 4 | |
Manual Reference: 16-1 |
This is a straight forward layup. Just one ply of BID for the inside. It does take a while and I do seem to get a small number of air voids at the foam surface. Still, it worked out OK.
After cure, you can see in pic 3 the process of cleaning up the edges. An hour or so here.
Insides prepared
One ply BID
Post cure cleanup