Date: 12-30-2013 | |
Number of Hours: 10 | |
Manual Reference: 14-2 |
After cutting the troughs and smoothing them out a little on to the next adjustment.
An edge is now needed 2″ X 1″ which was pretty easy with a router followed up my the sanding stick. It only took a couple of hours for this step. You can see this done in pic3.
Spar cap area getting closer
Edges cut
Foam trimmed enough to go on