Date: 02-04-2012 | |
Number of Hours: 6 | |
Manual Reference: 5-2 |
Preparing UND glass for the fuselage inside. Two pieces required at a 30 degree angle. Took quite a while to lay it out at the right angle, cut to size and tape the edges, then roll it up for tomorrow. 2 Plies (four pieces were required)
Hey…thats me