• Home
  • Flying
    • First Flight
  • Build by Chapter
    • Ch 3 Education
    • Ch 4 Fuselage Bulkheads
    • Ch 5 Fuselage Sides
    • Ch 6 Fuselage Assembly
    • Ch 7 Fuselage Exterior
    • Ch 8 Roll Over/Seat Belts
    • Ch 9 Main Gear/Landing Brake
    • Ch 10 Canard
    • Ch 11 Elevators
    • Ch 12 Canard Installation
    • Ch 13 Nose and Nose Gear
    • Ch 14 CenterSection Spar
    • Ch 15 Firewall and Accessories
    • Ch 16 Control System
    • Ch 17 Roll/Pitch Trim System
    • Ch 18 Canopy
    • Ch 19 Wings, Alierons
    • Ch 20 Winglets/Rudders
    • Ch 21 Strakes – Fuel/Baggage
    • Ch 22 Electrical System
    • Ch 23 Engine Installation
    • Ch 24 Covers/Consoles
    • Ch 25 Finishing
    • Ch 26 Upholstry
  • Build Mods
    • Liquid Cooling, Numbers, Weights and Flow
    • Cooling
      • Solving Ground Cooling 1
      • Solving Ground Cooling 2
      • Solving Ground Cooling 3
      • Solving Ground Cooling 4
      • Solving Ground Cooling 5
      • Solving Ground Cooling 6
      • Solving Ground Cooling7 – Test Data
      • Solving Ground Cooling 8 – Flap Building
      • Solving Ground Cooling 9 – Hinges
      • Solving Ground Cooling 10 – Lower Flaps
      • Solving Ground Cooling 11 – Upper Flaps
      • Solving Ground Cooling 12 – Completed
      • Cooling the Beast 1
      • Cooling the Beast 2 – Lower Cowl Expansion
      • Cooling the Beast 3 – KW Oil Cooler Diffuser
    • EVS (Enhanced Vision System)
    • Cowl Keeper
    • Rudder Gust Locks
    • Wing Fences
    • Post Cure
    • Hinge Upgrade
    • RAM Air & Hellhole Cover
    • Main Gear Beef Up
    • Pilot Side Windows
    • Baggage Pods
    • Winglet Intersection Fairings
    • Titanium Rollover
    • Nose Gear Doors
    • Wheel Pants/Gear Leg Fairing
    • Cabin heating System
    • Fuel System
    • Roll and Pitch Trim
    • Oxygen System
    • The Ferry Tank
    • Cruise Angle Indicator
    • Fire Extinguisher Install
  • Round the World
    • RTW Route East #12 rev1
    • Survival Equipment
    • Training Flights
  • Other Stuff
    • Blog
    • Around the World: RAAUS Sport Pilot Issue 110
    • Taxi Tests
    • Summary Feb ’24 from an SAAA Meeting
    • AOPA Pilot 27th Sept 2019
    • Build Tests
    • Flying Stories
      • A Long Easy Dream ’06
      • Townsville ’07
      • Cairns ’08
      • Albany ’08
      • East Coast ’08
      • Brisbane ’09
      • Cairns ’10
      • Perth ’10
    • Non Build Mods
      • F16 Scoop for JZE
      • Ram Air Box for JZE
      • Strange Tips
    • Milestones
    • Links
  • Contact

Blog

Home
Blog
Mounting the ECU Plugs and Vent Tubes

Mounting the ECU Plugs and Vent Tubes

2 years ago
Dave Berenholtz
Blog, Ch 22 Electrical System
Date:  10-10-2023
Number of Hours:  22
Manual Reference:  22

Two jobs here. Now I know where the expansion tank is going I can mount the plugs for the ECU’s. This is a ‘firewall penetration’.

I am getting very low on click bonds so I made a bunch of nutplates instead. Now I’ve sourced some more and ordered 50, next time I can go back to the more time effective method of glassing them on. However as the margins are really tight space wise these bad boys will do the job.

Of course while looking at the ECU plugs, now is the time to really nail down all those vent tubes in the same area. I started with embedding nutplates and then glassing over the top. You can just see three of them.

Back to the plugs. I thought about steel for fire protection…but who am I kidding, the plastic plugs will fail way before the aluminum plate! And, yes, old school file work.

I should have made the plate a little bigger but it will work out OK. The pre-drilled plastic mounts have made it a bit tricky.

I said it was tight, and I do want to keep holes in the firewall at a minimum. This took a bit of extra filing in the end to ensure the plugs had enough room to be put on and secured on the engine side.

Yes vent pipes on and off again. I keep checking to ensure I don’t snooker myself. This will work.

Again some glass over the top to settle it all down.

A bit of grey paint later too. I just can’t help myself. It doesn’t look like much, a few mounting holes but this took several days work.

The vent lines needed a tweak and a slight re-bend. In the end two with P-clamps and I’ll just cable tie the third. What I am doing is trying to get the tension off the vent plenum vessel fittings so they don’t fail.

So the vent pipes went on and off several times again and you can just see the screw holes on the left. The plugs seem to fit pretty well.

On the hot side, I’ll add a little fire protection goo later to seal that area from fumes entering the cockpit. As I said earlier, the plugs will melt in a fire anyway.

I still had the vents on the left side of the plane to secure. After a lot of fiddling and thinking with pipes on and off again I’ve gone back to clickbonds. I found I could secure the pipes on the alternator cover. The rest of the securing job will be done a bit lower than the turtleback next to the baggage hole.

Here we are with pipes secured (although not done up fully), and the ECU’s back in. They ARE plugged in behind all that wire. I expect a few more cable ties will be needed to clean this all up and then I have a nice upholstered cover to hide the lot!

Previous Post
Header Tank and Firewall Planning
Next Post
Radiator Planning

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Fill out this field
Fill out this field
Please enter a valid email address.

CategoryLogsHours
All157617079
Uncategorized135
Ch 3 Education220
Ch 4 Fuselage Bulkheads25231
Ch 5 Fuselage Sides32283
Ch 6 Fuselage Assembly30270
Ch 7 Fuselage Exterior14140
Ch 8 Roll Over/Seat Belts990
Ch 9 Main Gear/Landing Brake71642
Ch 10 Canard28287
Ch 11 Elevators36298
Ch 12 Canard Installation12102
Ch 13 Nose and Nose Gear1291097
Ch 14 CenterSection Spar57525
Ch 15 Firewall and Accessories448
Ch 16 Control System27237
Ch 17 Roll/Pitch Trim System654
Ch 18 Canopy70502
Ch 19 Wings, Alierons1271090
Ch 20 Winglets/Rudders71528
Ch 21 Strakes - Fuel/Baggage65437
Ch 22 Electrical System591031
Ch 23 Engine Installation961152
Ch 24 Covers/Fairings/Consoles25202
Ch 25 Finishing561084
Ch 26 Upholstry340
Fuel System46310
Rollover1050
Cabin heating System60331
The Ferry Tank335
Blog2694182
Build Mods2252513
Nose Gear Doors856
Wheel Pants/Gear Leg Fairing40473
Oxygen System762
Roll and Pitch Trim964
Winglet Intersection Fairings445
Baggage Pods11104
Pilot Side Windows437
RAM Air & Hellhole Cover15177
Main Gear Beef Up322
Post Cure124
Fire Extinguisher16
Wing Fences13
EVS (Enhanced Visual System)130
Hinge Upgrade115
Cowl Keeper110
Rudder Gust Locks19
Cooling20607
Taxi Tests42
Flying10

Complete the Test Flight Program

2025/6/30 10:26:01

Round Australia in Four Flights

2026/4/1 10:26:01

Round the World Departure

2026/8/22 10:26:01

Rough River Flyin, Sept 23, 2026

2026/9/23 10:26:01

© Copyright 2025 Dave Berenholtz