• Home
  • Flying
    • First Flight
  • Build by Chapter
    • Ch 3 Education
    • Ch 4 Fuselage Bulkheads
    • Ch 5 Fuselage Sides
    • Ch 6 Fuselage Assembly
    • Ch 7 Fuselage Exterior
    • Ch 8 Roll Over/Seat Belts
    • Ch 9 Main Gear/Landing Brake
    • Ch 10 Canard
    • Ch 11 Elevators
    • Ch 12 Canard Installation
    • Ch 13 Nose and Nose Gear
    • Ch 14 CenterSection Spar
    • Ch 15 Firewall and Accessories
    • Ch 16 Control System
    • Ch 17 Roll/Pitch Trim System
    • Ch 18 Canopy
    • Ch 19 Wings, Alierons
    • Ch 20 Winglets/Rudders
    • Ch 21 Strakes – Fuel/Baggage
    • Ch 22 Electrical System
    • Ch 23 Engine Installation
    • Ch 24 Covers/Consoles
    • Ch 25 Finishing
    • Ch 26 Upholstry
  • Build Mods
    • Liquid Cooling, Numbers, Weights and Flow
    • Cooling
      • Solving Ground Cooling 1
      • Solving Ground Cooling 2
      • Solving Ground Cooling 3
      • Solving Ground Cooling 4
      • Solving Ground Cooling 5
      • Solving Ground Cooling 6
      • Solving Ground Cooling7 – Test Data
      • Solving Ground Cooling 8 – Flap Building
      • Solving Ground Cooling 9 – Hinges
      • Solving Ground Cooling 10 – Lower Flaps
      • Solving Ground Cooling 11 – Upper Flaps
      • Solving Ground Cooling 12 – Completed
      • Cooling the Beast 1
      • Cooling the Beast 2 – Lower Cowl Expansion
      • Cooling the Beast 3 – KW Oil Cooler Diffuser
    • EVS (Enhanced Vision System)
    • Cowl Keeper
    • Rudder Gust Locks
    • Wing Fences
    • Post Cure
    • Hinge Upgrade
    • RAM Air & Hellhole Cover
    • Main Gear Beef Up
    • Pilot Side Windows
    • Baggage Pods
    • Winglet Intersection Fairings
    • Titanium Rollover
    • Nose Gear Doors
    • Wheel Pants/Gear Leg Fairing
    • Cabin heating System
    • Fuel System
    • Roll and Pitch Trim
    • Oxygen System
    • The Ferry Tank
    • Cruise Angle Indicator
    • Fire Extinguisher Install
  • Round the World
    • RTW Route East #12 rev1
    • Survival Equipment
    • Training Flights
  • Other Stuff
    • Blog
    • Around the World: RAAUS Sport Pilot Issue 110
    • Taxi Tests
    • Summary Feb ’24 from an SAAA Meeting
    • AOPA Pilot 27th Sept 2019
    • Build Tests
    • Flying Stories
      • A Long Easy Dream ’06
      • Townsville ’07
      • Cairns ’08
      • Albany ’08
      • East Coast ’08
      • Brisbane ’09
      • Cairns ’10
      • Perth ’10
    • Non Build Mods
      • F16 Scoop for JZE
      • Ram Air Box for JZE
      • Strange Tips
    • Milestones
    • Links
  • Contact

Blog

Home
Blog
Eleventh Year Summary

Eleventh Year Summary

2 years ago
Dave Berenholtz
Blog, Milestones
Date:  12-01-2022
Number of Hours:  0
Manual Reference:  no ref

Build start DEC 1 2011
Today is DEC 1 2022

Eleven Years Building.

The log shows 13,363 hours but of course its a lot more than that. OK this is the year I fly, 2023.

As I said last year in this Summary I was expecting the engine to be delivered March 2022. I ordered it around February 2018! It is now December the first 2022 and all I have are promises. In fact it is now meant to be built in the coming week at the California build center. I can’t see me getting it before January now. So much for flying this year.

It has a name. Gladiator LIO-390. We are hoping for 260HP. I backed away from the stroked 300HP version as its another 30Ibs of weight at the back and frankly I don’t need the horsepower, 260HP will be quite enough.

I’m pretty much stopped and off the build until I get the engine. Its just time lost and moving away from the next Northern hemisphere summers for when I am ready to go. I think I have at least four months build time before the first taxi and maybe six months. Other say a year, but I don’t listen to them.

A few things have been done this last year and a long list of clean up jobs have been completed.

Avionics are in, wires laid out. We have done as much as we can until the engine arrives and I can get to the firewall penetrations and so on.

The nose is full. Brake fluid in the lines, pitot static system hooked up.

The nose art is finally done and makes ‘The Beast’ distinctive. The registration marks should go on this month. That design has been finalised.

The canopy and hatch seals are all done. The canopy hardware is installed and working well.

The insides of the cowls have been remade. This is going to allow much bigger radiators which MIGHT be large enough to cool the engine. The outside profile of course is a little bigger but its a small change for a big result. Radiators cannot be made until the engine comes so I can make 100% use of the space.

I purchased a large oil radiator that will sit behind the sump and be fed via a duct from the right armpit. That inlet will be split into two with the other side feeding a water radiator. The left armpit will be all water radiator feed and a larger one as that side has the offset cylinder making more room.

I made my first carbon fiber KW duct as you see above. I now wish I’d used carbon for a lot of things to get the weight reduction and extra strength.

Overall not that much happened in this year when I thought I’d be taxi testing by December. Now its just a wait for the engine before I ramp it all up again. I have done a number of IFR flights in JZE now and a bit of sim work with that finally going well.

2023, the 12th year of the build, XEZ will fly.

 

 

 

 

 

Previous Post
Piss Tube, Hammer, Fuel Run and Brake Fluids
Next Post
Engine Build Progress 1

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Fill out this field
Fill out this field
Please enter a valid email address.

CategoryLogsHours
All157617079
Uncategorized135
Ch 3 Education220
Ch 4 Fuselage Bulkheads25231
Ch 5 Fuselage Sides32283
Ch 6 Fuselage Assembly30270
Ch 7 Fuselage Exterior14140
Ch 8 Roll Over/Seat Belts990
Ch 9 Main Gear/Landing Brake71642
Ch 10 Canard28287
Ch 11 Elevators36298
Ch 12 Canard Installation12102
Ch 13 Nose and Nose Gear1291097
Ch 14 CenterSection Spar57525
Ch 15 Firewall and Accessories448
Ch 16 Control System27237
Ch 17 Roll/Pitch Trim System654
Ch 18 Canopy70502
Ch 19 Wings, Alierons1271090
Ch 20 Winglets/Rudders71528
Ch 21 Strakes - Fuel/Baggage65437
Ch 22 Electrical System591031
Ch 23 Engine Installation961152
Ch 24 Covers/Fairings/Consoles25202
Ch 25 Finishing561084
Ch 26 Upholstry340
Fuel System46310
Rollover1050
Cabin heating System60331
The Ferry Tank335
Blog2694182
Build Mods2252513
Nose Gear Doors856
Wheel Pants/Gear Leg Fairing40473
Oxygen System762
Roll and Pitch Trim964
Winglet Intersection Fairings445
Baggage Pods11104
Pilot Side Windows437
RAM Air & Hellhole Cover15177
Main Gear Beef Up322
Post Cure124
Fire Extinguisher16
Wing Fences13
EVS (Enhanced Visual System)130
Hinge Upgrade115
Cowl Keeper110
Rudder Gust Locks19
Cooling20607
Taxi Tests42
Flying10

Complete the Test Flight Program

2025/6/30 10:26:01

Round Australia in Four Flights

2026/4/1 10:26:01

Round the World Departure

2026/8/22 10:26:01

Rough River Flyin, Sept 23, 2026

2026/9/23 10:26:01

© Copyright 2025 Dave Berenholtz